Scoping EAW
The DNR and U.S. Army Corps of Engineers took comments on the proposed EIS scope during a 30-day scoping period that concluded on July 6, 2005. A public scoping meeting was held on June 29, 2005, in Hoyt Lakes, Minnesota. The Final Scoping Decision operates as a blueprint for EIS preparation.
- Scoping EAW (1.2mb)
- Draft Scoping Decision (112kb)
- Figure 5-1 (1.2mb)
- Figure 5-2 (2.3mb)
- Figure 5-3 (2.3mb)
- Figure 5-4 (5.4mb)
- Figure 5-5 (654kb)
- Figure 5-6 (1.2mb)
- Figure 5-7 (2.4mb)
- Figure 6-1 (113kb)
- Figure 6-2 (514kb)
- Figure 6-3 (892kb)
- Figure 6-4 (603kb)
- Figure 11-1 (1.3mb)
- Figure 11-2 (1.3mb)
- Figure 11-3 (2.2mb)
- Figure 11-4 (2.5mb)
- Figure 11-5 (2.9mb)
- Figure 11-6 (2.3mb)
- Figure 12-1 (2.5mb)
- Figure 12-2 (2.5mb)
- Figure 12-3 (2.5mb)
- Table 12-1 (12kb)
- Table 12-2 (12kb)
- Table 12-3 (10kb)
- Table 12-4 (12kb)
- Figure 13-1 (2.2mb)
- Figure 17-1 (2.6mb)
- Figure 17-2 (2.5mb)
- Figure 17-3 (2.5mb)
- Table 17-2 (166kb)
- Figure 18-1 (1.3mb)
- Figure 19-1 (2.5mb)
- Figure 20-1 (1.0mb)
- Table 23-2 (110kb)
- Table 23-3 (110kb)
- Appendix A (136kb)
This information is available in an alternative format upon request. Contact the DNR Information Center.